Sun 22 Nov 2026
← Home

Calp completes project to restore Quisi and Pou Roig watercourses

Calp Town Council now has the project to environmentally recover the urban sections of the Quisi and Pou Roig watercourses, with the aim of reducing the risk of flooding and increasing biodiversity.

La Marina Times newsroom
Wednesday 4 November 2026, 15:21 · 2 min read
AIWritten with AI assistance from the sources cited and reviewed by our editors. How we work
Calp completes project to restore Quisi and Pou Roig watercourses
La Marina Times

Calp Town Council has completed the drafting of the project that will allow the renaturalisation of 889 metres of the urban section of the Quisi watercourse and 786 metres of Pou Roig. The study, prepared by the companies Calco Territorio y Urbanismo and Biodiversity Node, proposes eliminating invasive species, promoting biodiversity and improving the capacity of the watercourses in the face of intense rainfall episodes.

According to the study, common reed (Arundo donax) currently occupies more than 10,000 square metres of these watercourses. To eradicate it, screening with backhoes in the riverbed and solarisation with black sheeting on the banks is planned. After its removal, native Mediterranean species will be planted and stone deflectors will be placed to retain sediments.

The project also includes the recovery of a municipal green area of 16,000 square metres known as the Saleta, which is conceived as a viewpoint towards Serra d'Oltà equipped with recreational and sports facilities. At that point, the watercourse will widen by five metres and the paths will be built with permeable and draining surfaces to facilitate water infiltration during floods.

The councillor for the Environment, Pere Moll, explained the purpose of the work: "With this project we aim to improve the response capacity of the watercourses in the face of intense rainfall episodes as well as to environmentally recover a natural space of great value for the municipality".

The Town Council estimates the cost of the works at €1.6 million, with execution planned over several years. The work comes after September 2022, when Local Police officer Juan Manuel Policarpo Moll died in the line of duty during a flooding episode in the municipality.

Sources

ShareFacebookXWhatsApp

Get La Marina Times in your inbox

The most relevant news of the Marina Alta every morning, or the week's most read every Friday.

Frequency

Comments (0)

Comment guidelines
Sign in to join the conversation. Comments are published under your display name.
No comments yet. Be the first.